Hydro Plant Levels/Flows

This information is updated every hour for river users near AEP's hydroelectric facilities. See plant locations.

Table of levels and flows

Explanation of terms:

The 'Forebay' and 'Tailwater' numbers show the elevation, in feet above sea level, of the water levels just upstream and downstream of the plants. 'Tailwater Flow' is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second. One other measurement, 'Adjusted Elevation', applies only to Smith Mountain Lake. It indicates the level the lake would be if the water currently held in the lower Leesville Lake for reuse were pumped back into Smith Mountain Lake.

Last Updated 21-MAY-2012 09:05 EDT.
Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS) Adjusted Elevation
Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS) Adjusted Elevation
Roanoke River
Niagara 885.00 884.64
Smith Mountain 795.00 794.22 604.62 794.83
Leesville 613.00 604.50 535.58
New River
Buck 2003.40 2002.89 1961.78 2598
Byllesby 2079.20 2078.79 2023.58 2571
Claytor 1846.00 1845.46 1730.51 3802
Kanawha River
London 614.00 614.00 590.90 9472
Marmet 590.00 589.80 568.25 7899
Winfield 566.00 566.16 540.33 9434
James River
Reusens 550.70 550.99 518.55 10577
Ohio River
Racine 560.00 561.15 542.13 0
Saint Joseph River
Constantine 782.90 782.87 771.24
Mottville summer: 770.40
winter: 770.00
770.48 759.46 1726
Elkhart summer: 741.50
winter: 739.50
741.53 722.07
Twin Branch 717.10 717.02 696.15 2829
Buchanan summer: 637.50
winter: 637.00
637.54 623.26 0
Berrien Springs 623.50 623.59 591.48 3360

 

ALL HYDRO PROJECTS MAY HAVE FLOW MODIFICATIONS CAUSED BY WEATHER CONDITIONS OR OTHER DEMANDS. CHANGES MAY BE MADE WITHOUT NOTICE.

FOR CURRENT RESERVOIR LEVELS, CALL 540-985-2767 OR CONSULT THE WEBSITE AT AEP.COM.

THE LONDON TAILRACE FISHING ACCESS HAS BEEN TEMPORARILY CLOSED DUE TO THE ABSENCE OF A DESIGNATED PUBLIC ACCESS FROM RT. 61. APPALACHIAN IS IN THE PROCESS OF OBTAINING PUBLIC ACCESS TO THE SITE.

AS OF 05:00 THIS MORNING MONDAY MAY 21, 2012, INFLOW TO THE SMITH MOUNTAIN PROJECT WAS 900 CFS AND THE DISCHARGE FROM LEESVILLE 994 CFS. THE ADJUSTED RESERVOIR ELEVATION WAS 794.81'. THE FLOW RATE AT THE USGS GAUGE AT BROOKNEAL WAS 1940 CFS, STAGE 7.53' AND AT ALTAVISTA 1280 CFS, STAGE 4.04'.

APPALACHIAN POWER OPERATES CLAYTOR HYDRO IN LEVELIZED "RUN OF RIVER" RELEASE FROM APRIL 1ST TO NOVEMBER 30TH AND IN PEAKING MODE FROM DECEMBER 1ST TO MARCH 31ST. FOR MONDAY MAY 21, 2012, TWO UNITS WILL BE GENERATING. ESTIMATED DISCHARGE FOR THE DAY IS 3800 CFS.

Use of this site constitutes acceptance of the AEP Terms and Conditions. © 1996-2012 American Electric Power. All Rights Reserved.